摘要
太平驿水电站厂区的前期地质工作基本上反映了厂区岩体的实际地质情况,对厂房枢纽布置有重要实际意义。在此基础上,枢纽布置设计经历了几个设计阶段。经过一步步优化设计,使厂房位置和轴线的选择,厂房枢纽的布置,尾水系统的布置等,均达到了优化、合理的要求。
The antecedent geological survey for the powerhouse area of Taipingyi Hydropower Station basically reflects the actual geological conditions of rock body in the area so that it has an important significance for the general layout of powerhouse. On the basis, the several design phases of general layout have been undergone. Through optimal design one after another, the selection of the powerhouse location and axis, and the general layout of powerhouse and tailrace tunnel, etc. have reached the requirements of optimization and reasonableness.
出处
《水力发电》
北大核心
1995年第12期25-29,13,共6页
Water Power
关键词
水电站
地下式厂房
Taipingyi Hydropower Station, underground powerhouse, geological conditions, powerhouse axis,powerhouse design, layout design.