摘要
为寻找高效率消能工型式,促进从泄材来的高速水流由动能转化为位能.也减轻了对下游的冲刷,节省工程投资.
The high-velocity flow the outlet of ovethow spillway has a tremedous erosive and destructive effect on the energy dissipator and river bed because of its large unit discharge and centralized water flow. The aim of this hydraulic test is to search the type Of high effective dissipator, Which can be transfered kinetic energy of the high-velocity flow into potential energy and reduced erosha to the downstream of dam as well as minimized the damage and saved the project inveSt.Through Gompahag with various plans, the last proposed plan has a higher energy dissipation efficiency, under the condition of design flood frequency equalling to 2%,the energy dissipation efficiency can be increased 19% than those of thoriginal plan.
出处
《水电能源科学》
北大核心
1995年第4期279-282,共4页
Water Resources and Power
关键词
溢洪道
消力池
消能工
水力试验