大河枢纽溢洪道水力试验研究 被引量:3

STUDY ON THE HYDRAULIC TEST OF SPILLWAY IN THE BIG RIVER CONSTRVCTIONS
在线阅读 下载PDF
导出
摘要 为寻找高效率消能工型式,促进从泄材来的高速水流由动能转化为位能.也减轻了对下游的冲刷,节省工程投资. The high-velocity flow the outlet of ovethow spillway has a tremedous erosive and destructive effect on the energy dissipator and river bed because of its large unit discharge and centralized water flow. The aim of this hydraulic test is to search the type Of high effective dissipator, Which can be transfered kinetic energy of the high-velocity flow into potential energy and reduced erosha to the downstream of dam as well as minimized the damage and saved the project inveSt.Through Gompahag with various plans, the last proposed plan has a higher energy dissipation efficiency, under the condition of design flood frequency equalling to 2%,the energy dissipation efficiency can be increased 19% than those of thoriginal plan.
作者 卜水发
出处 《水电能源科学》 北大核心 1995年第4期279-282,共4页 Water Resources and Power
关键词 溢洪道 消力池 消能工 水力试验 energy dissipation pond, energy dissipator, energy dissipation efficiency
  • 相关文献

同被引文献15

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部