摘要
对高混凝土面板堆石坝垫层料填筑施工工艺进行了总结,并介绍了对严寒地区垫层料的过冬保护措施进行的新尝试,可供其他同类型面板坝的施工参考。
The construction technology for the bedding of the face slab on high concrete face rock fill dam is summarized and then the new trial on the winter protection measures for the bedding material in cold region is also introduced herein, which can be taken as a reference for the similar projects.
出处
《水利水电技术》
CSCD
北大核心
2005年第8期29-30,34,共3页
Water Resources and Hydropower Engineering