摘要
本文探讨了在现代制造系统概念下,作业排序的目标及物流控制采用的策略,提出了一种CIMS-PPC系统作业排序方法的逻辑模型和数学模型.
The objectives of job scheduling and the strategies of material flow control with the concept of modern manufacturing system are discused, and both logical model and mathematical model of job scheduling in CIMS-PPC system are presented in the paper.