摘要
分析了某厂房柱基础沉陷事故的原因,提出采用旋喷桩进行加固处理的方案。实践证明,该方案操作简便,效果良好。
The causation for column foundation settlement of factory building is analysed in this paper' Therefore,the scheme of reinforcing foundation with chemical churning pile has been put up. Through practices, it isshown that the scheme is easy to carry out,and the results are satisfied.
出处
《低温建筑技术》
北大核心
1995年第4期33-34,共2页
Low Temperature Architecture Technology