摘要
以京广、京沪线部分开行5000t重载列车为背景,阐述在牵引定数不同的换重站上,普通列车与重载列车换重作业的条件;并对各种换重作业方案的作业流程及作业时间进行了分析,提出合理的采用条件。
Under the background of opening up 5 000t heavy haul train in Beijing-Shanghai and Beijing-Guangzhou Railway, this paper discusses on the working conditions of weight changing between ordinary trains and heavy haul trains at staion connected with railway sections of different tonnage rating, analyzes the working process and working time of various weight changing schemes, and puts forward their adoptable conditions reasonably.
出处
《北方交通大学学报》
CSCD
北大核心
1995年第A01期71-74,共4页
Journal of Northern Jiaotong University
关键词
列车
重载列车
列车技术作业
换重作业
ss:heavy haul train,technical operations of trains,weight changing