深基坑的开挖和支护工程,是整个建筑工程重要组成部分,其造价、工期在整个建筑工程中占很大比例。本文通过山西省电力局中心调度大楼的基坑开挖中存在的问题所采取的补救措施及问题分析初探,提出太原地区在受到周围场地限制、地下水位高情况下,深基开挖中应注意和考虑的问题。
The digging and retaining project of deep foundation is an important part in whole construction. Its cost and time limit take the major proportion in and prdblem analysis in a real project in shanxi,and suggest the problems and items which should be considerated in digging deep foundation under the conditions of high water level and the field limited by around buildings.
出处
《电力学报》
1995年第3期17-22,共6页
Journal of Electric Power
关键词
支护系统
堵漏
降水
深基坑
基础开挖
dig deep foundation
retaining system
stop up leaking
reduce water level