简要介绍杭州湾跨海大桥钢板桩围堰与钢吊箱围堰施工方案,重点对两种方案进行技术经济比较,同时对两种施工方案适用条件进行总结阐述。
The construction plans of steel sheet pile cofferdam and steel hung cofferdam for Hangzhou Bay Cross - sea Bridge are introduced. Particularly, the two plans are technologically and economically compared and the respective conditions to which each plan is applicable are discussed and summarized.
出处
《石家庄铁道学院学报》
2005年第B06期89-91,共3页
Journal of Shijiazhuang Railway Institute
关键词
海上滩涂区
钢板桩围堰
钢吊箱围堰
技术经济比较
sea beach
steel sheet pile cofferdam
steel hung cofferdam
technological and economic comparison
applicable conditions