摘要 根据国家及地方相关规范以及场地地质勘擦资料,设计了开挖深度为5.70m的淤泥质基坑的钻孔灌注桩支护,坑壁止水问题由桩间旋喷水泥浆解决。具体计算了桩的基坑的内外侧最大弯矩,最大剪力,桩的配筋,桩顶位移,以及基坑的整体抗滑稳定性和抗倾覆稳定性。目前基础施工已顺利完工,表明本设计已取得成功,并且较好地实现了安全与经济指标的统一。 Acoording to the related standards of China and locality ,and the material of the geological prospecting of the site, retaining and protecting for the foundation excavation of silt which is 5.70 feet deep with drill-pour-piles is designed.The problem of the water-seal for the foundation excavation wall is solved with revolve-spurt cement mortar between the piles.The maximum bending moment and shear for the inter outer of foundation excavation,and used the reinforment quantity of the piles and the displacements of pile top, and the integral stability of the resist slide and the resist overturn for foundation excavation are computed. Now the construction of the foundation was completed successfully. It was showed that this design is succeed. And the safety and economy indexes are unanimity well.
作者 冯耀东
出处 《中山大学学报(自然科学版)》 CAS CSCD 北大核心 2005年第B06期193-196,共4页 Acta Scientiarum Naturalium Universitatis Sunyatseni
关键词 淤泥质基坑 钻孔灌注桩 支护 foundation excavation of silt drill-pour-piles retaining and protecting
  • 相关文献

参考文献6

  • 1JGJ120—99.建筑基坑支护技术规程 [S].[S].国家建设部,..
  • 2GBJ/15—20—97.广东省标准 建筑基坑支护工程技术规程 [S].[S].,..
  • 3DBJ/15—31—2003.广东省标准 建筑地基基础设计规范 [S].[S].,..
  • 4GJB02—98.广州市标准 广州地区建筑基坑支护技术规定 [S].[S].,..
  • 5陈希哲.土力学地基基础[M].北京:清华大学出版社,2000.116-116.
  • 6余志成 施文华.深基坑支护设计与施工[M].北京:中国建筑工业出版社,2000.71-81.