糯扎渡水电站工程规模巨大、枢纽区工程地质条件复杂,坝址右岸分布有构造软弱岩带等。在对枢纽区进行大量勘探、试验和对主要工程地质问题进行深入分析研究的基础上,选择了较适合枢纽区地形地质条件的水工建筑物布置格局,并对各主要建筑物提出了评价意见。
The Nuozhadu Hydropower Station is huge in project scale and complex in engineering geological conditions and has weak tectonic zones on the right bank of its dam site. Based on a lot of surveys, tests and deep analysis on the major engineering geological issues, a proper hydraulic structures layout that adapt to the geological and topographical conditions has been selected. This paper also evaluates the major structures.
出处
《水力发电》
北大核心
2005年第5期26-27,49,共3页
Water Power
关键词
工程地质问题
坝址选择
地下洞室群
溢洪道
糯扎渡水电站
engineering geological problem
selection of dam site
underground tunnels
spillway
Nuozhadu Hydropower Station