摘要
介绍了运用定向控制爆破技术拆除35m高框架结构水泥立窑的方案设计和爆破参数确定。采用毫秒延期电雷管与导爆管雷管混合网路,爆破取得了预期效果。
The scheme and blasting parameters of demolishing 35-meter high reinforced concrete kiln using directional blasting is presented. Complex web of MS delay electric detonator and nonel tube is applied in this project. The expected result is obtained.
出处
《煤矿爆破》
2004年第3期37-38,共2页
Coal Mine Blasting
关键词
水泥立窑
框架结构
微差起爆
定向爆破
concrete kiln reinforced concrete structure millisecond detonation directional blasting