圆梁山隧道施工期间增加辅助坑道的设计与施工 被引量:5

The Design and Engineering for Additional Accessorial Tunnels While the Main Tunnel Is under Construction in Yuanliangshan Tunnel
在线阅读 下载PDF
导出
摘要 在圆梁山隧道修建期间,为解决进口车站大跨段的快速施工以及施工中所遇到的2、3、4和5号溶洞的涌水涌砂难题,创造性地新增设了3条横通道、1条地质探洞、2条迂回导坑和4条泄水洞共10条辅助坑道。主要介绍了施工期间增设的10条辅助坑道的设计与施工。 In order to solve the water and sand inflows during the construction of Yuanliangshan Tunnel, as well as to speed up the construction of big stride of inlet station, 10 accessorial tunnels were creatively built. They are transverse, geological explore, roundabout and draining tunnels. The paper mainly introduces the design and construction of these accessorial ones.
作者 曾蔚 张民庆
出处 《探矿工程(岩土钻掘工程)》 2005年第5期56-59,共4页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 圆梁山隧道 辅助坑道 设计与施工 Yuanliangshan tunnel accessorial tunnels design and construction
  • 相关文献

同被引文献20

  • 1张民庆,孙国庆,彭峰.圆梁山隧道高压富水区径向注浆技术研究及应用[J].隧道建设,2004,24(5):21-27. 被引量:10
  • 2李庚许,袁德友,汤世明.黄土、砂砾、涌水地层浅埋隧道施工技术[J].铁道标准设计,2005,25(9):88-91. 被引量:4
  • 3中铁二局集团有限公司.TB 10204-2002铁路隧道施工规范[S].北京:中国铁道出版社,2002.
  • 4铁道第二勘察设计院.TB 10003-2005,铁路隧道设计规范[S].北京:中国铁道出版社,2005.
  • 5中铁二局集团有限公司.TB10204-2002铁路隧道旋工规范.中国铁道出版社,2002.
  • 6铁道第四勘察设计院.宜万铁路宜昌至万州段新建工程施工图—齐岳山隧道设计图[R].武汉,2004—03
  • 7铁道第四勘察设计院.宜万线长大岩溶隧道专项地质勘察—齐岳山隧道工程地质勘察报告[R].武汉,2004—03
  • 8北京交通大学.宜万铁路岩溶地区隧道灾害防治技术与结构设计的研究—岩溶灾害地质评价方法与防治对策研究阶段报告(Ⅱ)[R].2005—08
  • 9Q/ZTG21400-2006,客运专线铁路隧道工程施工技术规范[s].
  • 10铁道部隧道工程局. TB10109-95 铁路隧道辅助坑道技术规范[S]. 北京:中国铁道出版社,1995.

引证文献5

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部