期刊文献+

多智能体技术在机组组合运行与管理分析中的应用 被引量:2

Application of multi-agent technique to unit commitment operation and management analysis
在线阅读 下载PDF
导出
摘要 电力系统机组组合问题是一个典型的大规模混合整数的非线性组合优化问题,很难得到理论上的最优解。该文提出了求解机组组合问题的多智能体体系结构,并且提出了自治与分级管理相结合的3层MAS系统体系结构,最终通过协调Agent、任务Agent、发电Agent的协商、谈判,获得了机组组合问题的一个较为满意的解。 Power system unit commitment, a problem of nonlinear commitment optimization with typical large-scale hybrid integers, is difficult to get an optimal solution in theory. To solve this problem, this paper proposes a multi-agent system, and the structure of three-layer MAS combined with autonomy and level-management is provided. With the consulation and negotiation between coordinate Agent, task Agent and power-generating Agent, an optimal solution for unit commitment problems is obtained. The experiment results prove that the multi-agent system is able to find a satisfactory optimal solutions.
作者 赵波 曹一家
出处 《继电器》 CSCD 北大核心 2005年第8期22-26,共5页 Relay
关键词 电力系统 机组组合 多智能体系统 AGENT power system unit commitment multi-agent system agent
  • 相关文献

参考文献7

二级参考文献11

  • 1[1]SHAW J P. The design of a distributed knowledge_based approach for the intelligent manufacturing information system [D]. PhD thesis,West Lafayette, IN:Purdue Univ.,1984.
  • 2[2]UPTON D M. The operation of large computer controlled manufacturing system[D].PhD thesis,West Lafayette, IN: Shool of Industrial Engg.,Purdue Univ.,Dec.1988.
  • 3[3]TILLEY K J,WILLIAMS D J.Modeling of communications and control in an auction-based manufacturing control system[C]. Proc. Of 1992 IEEE Int'l Conf. On Robotics and Automation, Nice, France.
  • 4[4]JAYAMOHAN M S, RAJENDRAN C.New dispatching rules for shop scheduling: a step forward[J].International Journal of. Production Research, 2000,38(3):563-586.
  • 5[5]VEPSALAINEN A P J,MORTON,T E.Priority Rules for job shops with weighted tardiness costs[J]. Management Science,1987,33:1035-1047..
  • 6[6]CARROLL D C.Heuristic sequencing and multiple component jobs[D]. Unpublished PhD dissertation, Massachusetts Institute of Technology, Cambridge, MA.1965.
  • 7[7]BAKER K R,KANET J J.Job shop scheduling with modified due dates[J]. Journal of Operations Management, 1983,4:11-22.
  • 8[8]BAKER K R,BERTRAND J W M.A dynamic priority rule for sequencing against due-dates[J]. Journal of Operations Management, 1982,20:27-45.
  • 9Kanji U,Annals CIRP,1997年,46卷,1期,343页
  • 10陈皓勇,张靠社,王锡凡.电力系统机组组合问题的系统进化算法[J].中国电机工程学报,1999,19(12):9-13. 被引量:75

共引文献77

同被引文献11

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部