期刊文献+

上海某大厦托梁拔柱工程的设计 被引量:8

A DESIGN SCHEME OF STRENGTHENING LONG-SPAN RC BEAM WITH DEMOLISHING COLUMN
在线阅读 下载PDF
导出
摘要 通过托梁拔柱实现大空间在工程中并不少见 ,对某工程采用主、被动相结合的手法 ,把预应力和粘钢加固综合应用在抽柱后形成的大跨度梁上 ,将梁柱节点设置为铰接以减小对柱的抗弯承载力的影响 ,合理设置体外预应力转向块 ,提高了安全度 ,同时便于施工 。 It′s a passive method to reinforce RC beam with glued steel plate and enlarging cross section while the post-stressed method is an active one.This paper introduced a reconstruction project of a long span RC beam with demolishing column,which applied the advantages of the above two types.The beam-column joint is designed as a hinged one to reduce the effect on bending bearing capacity of columns,and the transfer of external prestress is also set properly,which may be served as reference for the design of similar reconstruction projects.
出处 《工业建筑》 CSCD 北大核心 2005年第4期21-23,共3页 Industrial Construction
  • 相关文献

参考文献5

  • 1GB50010-2002.混凝土结构设计规范.[S].,..
  • 2CECS25:90.混凝土结构加固技术规范.[S].,..
  • 3DBJ08-69-97.预应力混凝土结构设计规程.[S].,..
  • 4GB50009-2001.建筑结构荷载规范.[S].,..
  • 5JGJ140-2004.预应力混凝土结构抗震设计规程.[S].,..

共引文献436

同被引文献22

引证文献8

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部