摘要
针对施工中PHC管桩倾斜断裂问题,结合工程实践经验,从工程地质勘察、施工、焊接、截桩等方面,对其产生的原因进行了分析,并提出了有针对性地预防措施。
According the inclined fracture of PHC pipe pile encountered in construction, combined with practice its causing reasons are analyzed from geology investigation, construction and other aspects; at the same time corresponding preventive measures are proposed.
出处
《山西建筑》
2005年第8期84-85,共2页
Shanxi Architecture
关键词
PHC管桩
倾斜断裂
工程地质
pressured high-strength concrete pipe pile, inclined fracture, engineering geology