摘要
结合某铁路扩能提速工程,阐述了岩溶地区钻孔桩施工方法,介绍了具体的技术控制措施,针对施工中遇到的问题,提出了相应的技术对策,总结了几点体会。
Combined with energy-expanding & speed-increasing project of a railway,it illustrates constructive method of hole-digging pole in Karst area,introduces concrete technical control measures,puts forward corresponding technical countermeasures in connection with problems in construction,and concludes several experiences.
出处
《山西建筑》
2005年第8期83-84,共2页
Shanxi Architecture
关键词
岩溶地区
钻孔桩
溶洞
Karst area, hole-digging pile, limestone cave