摘要
在分析与既有线接轨道岔施工方法研究的必要性和现状的基础上 ,对上海市轨道交通 8号线人民广场站与既有 1号线接轨道岔的实施方案进行了多方案的研究 ,进而提出了推荐无枕式整体道床方案的具体施工组织步骤和工艺流程及平立面布置。
Based on the analysis of necessity and existing status of switch construction fo r track joint with existing line, several alternative schemes of switch construc tion for track joint between Shanghai Rail Transit Line No.8 (Line M8) and e xisting Line No.1 at the People's Square Station are studied. Thus the construction organiza tion and technical process of integral track bed scheme without timber as well a s plan and vertical arrangement are recommended.
出处
《地下工程与隧道》
2005年第1期9-11,55,共3页
Underground Engineering and Tunnels