摘要
结合具体的施工实践 ,详细介绍了冬季大钢模热工计算的方法和要点 ,经实践证明 ,此计算方法是可行的 ,计算过程中的几个变量可根据现场时间调整 ,从而为冬季施工创造有利条件。
Combined with concrete constructive practice ,it introduces heat-working calculation & main points of big steel model in winter carefully .It is proven that this calculative method is reliable in which several variables can be adjusted according to actual situations so as to create advantageous conditions for construction in winter.
出处
《山西建筑》
2005年第7期104-105,共2页
Shanxi Architecture
关键词
冬季施工
大钢模
热工计算
construction in winter, big steel model, heat-working calculation