摘要
本文从R.Mindlin解出发,提出了计算桩基沉降量的方法。笔者曾将这一方法用以计算苏州市雅都大酒店的沉降量。
This paper presents a method for calculating the total settlement of pile foundation. The author used this method to calculate the settlement of The New World Aster Hotel which is the highest building in Suzhou till now.
出处
《苏州城建环保学院学报》
1994年第1期48-54,共7页
Journal of Suzhou Institute of Urban Construction and Environmental Protection
关键词
高层建筑
桩基础
沉降量
酒店
high building
pile foundation
settlement