摘要
安康水电站的泄洪消能布置中使用了宽尾墩、折流墩、异型挑坎和窄缝挑坎,其中宽尾墩消力池联合消能工在国内外是首次采用,对其进行水力学原型观测,验证新型消能。多年的试验研究成果,有重要的现实意义。从1990年到1993年,北京勘测设计院与有关单位联合进行了安康水电站水工建筑物水力学原型观测。
At the Ankang hydropower station flaring piers, deflection piers, special shaped buckets and slotted buckets are used for energy dissipation. Of these the flaring piers combined with stilling basin are first used in the world. From 1990--1993 the hydraulic prototype observation was done on their effects, showing that the experiment and research on energy dissipation that had been conducted for years had great practical significance. The text is a comprehensive interim report of the observation.
出处
《水力发电》
北大核心
1994年第1期12-17,共6页
Water Power
关键词
水电站
原型观测
泄水建筑物
the Ankang hydropower station
prototype observation
flaring pier
energy dissipation
experiment and research