摘要
仰山一级站大坝基础帷幕灌浆施工多方采取措施,改善施工条件;采用多种控制手段,保证设计要求的实行,建立健全质量保证体系,发现问题及时修改施工方案,保证工程质量;对单元工程及时进行验收评定,并对工程质量进行评价.
The main construction methods of the Yangshan first cascade hydyop-ower station curtain grouting are as follows:improving construction condition.using all sorts of control methods to make sure the device requirment to be car-ried out.Setting up and improving the quality control system,changing theconstruction device in time while any problem was found checking and evaluating the item project quality in time.