龙滩水电站的枢纽布置 被引量:2

Layout of Longtan Hydroelectric Project
在线阅读 下载PDF
导出
摘要 龙滩水电站是红水河上最大的综合利用工程,分期建设,前期坝高192m,装机420万kW,后期坝高216.5m,装机540万kW。本文介绍了坝址条件和重力坝方案枢纽布置的格局,初设审查批准后,由于决定利用碾压混凝土,对总布置又进行了调整和优化。 Longtan hydroeledric project,the largest multipurpose development in Hong-shui River,will be constructed in two stages. Dam hight will be 192m,and installed capacitywill be 4200MW in the first stage,The damhight will be raised up 216.5m with the corre-sponding installed capacity up to 5400MW in the second stage.This paper outlines the damsite conditions and project layout of the gravity dam scheme. After approval of the preliminary design report,the project configuration has been modifieddue to the decision of using roller compacted concrete,the overall final layout and major fea-tures are described in this paper.
作者 安申义
机构地区 长沙电力部
出处 《红水河》 1994年第3期5-10,共6页 Hongshui River
关键词 枢纽布置 水电站 设计 layout,Longtan hydroelectric project.
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部