摘要
龙滩水电站是红水河上最大的综合利用工程,分期建设,前期坝高192m,装机420万kW,后期坝高216.5m,装机540万kW。本文介绍了坝址条件和重力坝方案枢纽布置的格局,初设审查批准后,由于决定利用碾压混凝土,对总布置又进行了调整和优化。
Longtan hydroeledric project,the largest multipurpose development in Hong-shui River,will be constructed in two stages. Dam hight will be 192m,and installed capacitywill be 4200MW in the first stage,The damhight will be raised up 216.5m with the corre-sponding installed capacity up to 5400MW in the second stage.This paper outlines the damsite conditions and project layout of the gravity dam scheme. After approval of the preliminary design report,the project configuration has been modifieddue to the decision of using roller compacted concrete,the overall final layout and major fea-tures are described in this paper.
出处
《红水河》
1994年第3期5-10,共6页
Hongshui River
关键词
枢纽布置
水电站
设计
layout,Longtan hydroelectric project.