摘要
本文主要介绍了我国七十年代中期化工系统引进的众多国外冷却塔的主要特征及存在问题,并结合笔者近年的科研及改造实践分析阐述了对引进塔改造的技术措施及效果.
In this paper the principal features and problems of the cooling towers imported in the middle of 1970s by the large-size chemical facilities are presented and on the basis of author's practice in recent years the technical measures and results to reform the imported cooling towers are expounded.
出处
《给水排水》
CSCD
1994年第10期38-40,共3页
Water & Wastewater Engineering