摘要
给出了跨企业工程更改的管理策略,分析了工程更改的过程、信息、资源、组织和功能建模过程。以过程建模为中心,构建了5个视图建模的关联关系,通过多视图关联分析,形成了系统的ECM建模体系。
The management strategies for engineering change management (ECM) in inter-enterprises are presented. The process view, information view, resource view, organization view and function view of the ECM are analyzed. Based on the process view modeling, the interaction between the five views is constructed. Through the analysis of interaction, the multi-views modeling ECM system is performed.
出处
《航空制造技术》
2005年第1期84-87,100,共5页
Aeronautical Manufacturing Technology
基金
航空基金资助项目(03B08003)