摘要
通过介绍太白金矿利用崩落法回收分段凿岩阶段矿房法的矿柱,指出了崩落法在回收厚大矿柱过程中的应用特点及存在问题,提出了通过强化放矿管理来提高回收率。
through introducing of caving recover the pillar of sublevel drilling stage room stoping in Ti Bai Gold Mine,caving apply characterisic and quenstion exist in the process of recover wide pillar was pointed out, measure of improve recover rate through intensify draw managing was put forward。
出处
《黄金科学技术》
2005年第1期58-62,共5页
Gold Science and Technology