摘要
该工程是国家“七五”重点建设项目。在施工中探索出一些新技术、新工艺,初步形成了一整套天文建筑特殊综合施工技术。本文仅介绍北极星方位角测量定向法、弧形模板内撑外挂及洞口组合暗模三项新技术、新工艺。
This is one of the national priority projets in the 'Seventh-Five'Planning. In the construction,some new technologies were explored so that a set of special comprehensive techniques for astronomical buildings has preliminarily developed. In this article,it describes three techniques of orientation method of polaris azimuth measuring ,arc forms supporting inside and hanging outside and gang hidden forms on the oppening.
出处
《施工技术》
CAS
北大核心
1993年第5期10-11,共2页
Construction Technology