牛头山拱坝三维有限元计算和结构模型试验结果比较 被引量:2

Comparison of 3-D Finite Element Computation with Structural Model Tests for Niutoushan Arch Dam
在线阅读 下载PDF
导出
摘要 在拱坝研究中,由于岩体中存在断层、节理等不连续面,拱坝坝体及坝肩三维稳定分析十分复杂。以牛头山 拱坝为工程实例,分别进行了三维有限元计算和结构模型试验。研究表明计算结果和试验结果比较接近,计算和试 验得到的破坏机理也很相似。 The 3-D stability analysis of arch dams and their abutments are very complicated due to discontinuities such as faults and joints in the rockmass. In this paper, both 3-D finite element computations and structural model tests were applied to the stability of Niutoushan arch dam. It is concluded that the results of computation agree with those of experiments, and the failure mechanism provided by computation and model test are very similar.
出处 《西北水电》 2004年第4期60-62,共3页 Northwest Hydropower
关键词 拱坝 三维有限元 结构模型实验 位移 变形 arch dam 3-D FEM structural model test displacement deformation
  • 相关文献

参考文献2

  • 1[1]于骁中,林秋菊,杨佳梅,等.拱坝模型试验与格栅法计算结果的比较[A],水利水电科学研究院科学研究论文集第9集[C],1982.
  • 2朱伯芳.有限元原理与应用(第二版)[M].北京:中国水利水电出版社,1998,10..

共引文献1

同被引文献14

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部