摘要
本文通过对区域锅炉房集中供热运行工况的计算分析,得出了混水量G_h~′的变化范围和影响其变化的因素,修正了规范给出的G_h~′的计算公式,并提出了水温和流量的调节要求。
Based on analysis of operation condition of congregated heat supply network of district boiler, a modification of water mixing ratio G'h formula from National Standard is given, and requirement for water temperature and flow rate adjustment is mentioned.
出处
《煤气与热力》
北大核心
1993年第2期54-57,共4页
Gas & Heat
关键词
混水热力站
混水量
计算
Water mixing, Heat supply station, Operation condition Analysis, Water mining calculation