摘要
本文应用任意排列干扰井群方程,对某厂进行了井点降低水位计算,并进行了验算。
Using random arranged interfering well-group equations, this paper makes calculation of the well point drawdown of a certain plant. Checking computations have been made.
出处
《勘察科学技术》
1993年第2期11-14,共4页
Site Investigation Science and Technology