怒江六库水电站RCC纵向围堰防渗墙应力分析 被引量:1

Stress Analysis of Impervious Walls of RCC Longitudinal Cofferdams in Construction of Liuku Hydropower Project on Nujiang River
在线阅读 下载PDF
导出
摘要 采用二维非线性有限元分析方法,对六库水电站RCC纵向围堰防渗墙的防渗效果和应力应变状态进行了研究,在此基础上对防渗墙各截面的剪力、轴力和弯矩进行计算研究,提出了配筋方案。计算表明,防渗墙的防渗效果显著,分载作用明显,右防渗墙承受的弯矩更大些,应加大其配筋率。 The paper has made a study of impervious effect and stress-strain condition of the RCC longitudinal cofferdam impervious walls in construction of the Liuku hydropower project using two-dimensional non-linear definite element analysis method and put forward reinforcement scheme according to the calculation and study results of shear, axial force and bending moment of various cross sections of the impervious walls. The calculation indicates that the impervious walls produce significant impervious effects and proper load distribution effects, and the right impervious wall bears a bit more bending moment, which requires increase of ratio of reinforcement.
出处 《云南水力发电》 2004年第4期45-47,71,共4页 Yunnan Water Power
关键词 防渗墙 纵向围堰 水电站 RCC 防渗效果 怒江 应力分析 弯矩 配筋方案 配筋率 cofferdam impervious wall definite element stress strain
  • 相关文献

参考文献5

二级参考文献18

  • 1沈珠江,刘松涛.三峡二期高土石围堰应力应变分析研究[J].人民长江,1996,27(10):1-4. 被引量:23
  • 2陆述远.岩基重力坝抗滑稳定分析[A]..水工建筑物专题[C].北京:水利电力出版社,1995..
  • 3陈慧远,1988年
  • 4徐建荣,1988年
  • 5陈慧远,水利学报,1985年,4期
  • 6蒋国澄,土石坝工程,1984年,1期
  • 7团体著者,弹性力学问题的有限单元法,1982年
  • 8卢廷浩,河海大学学报,1997年,25卷,4期,26页
  • 9向大润,岩土工程学报,1983年,4期,78页
  • 10郑颍人 龚晓南.岩土塑性力学基础[M].北京:建筑工程出版社,1988..

共引文献49

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部