摘要
介绍我国应用留矿全面法的现状,综合评述该方法的主要方案、采场结构要素、采切工程布置及回采工作等,并对留矿全面采矿法存在的主要问题及其改进途径进行探讨。
In this paper, the present situation of the shrinkage-full mining method used in China is presented, and the main schemes, the construction element of mining stop, the arrangement of mining-cutting project and the stopping operation of the mining method are reviewed comprehensively, and the existing main problems of the shrinkage-full mining method and its improving way is discussed.
出处
《金属矿山》
CAS
北大核心
1993年第3期23-28,共6页
Metal Mine