摘要
快速估算工程造价是非常重要的.本文根据典型单位工程,利用模糊数学方法来快速估算欲估工程的造价,并把此法应用于实际工作中,取得了较满意的结果.
It is important to estimate engineering cost rapidly.On the basis of a typical unit engineering this engineering cost is estimated rapidly with the method of fuzzy mathematics.The method is applied to practical works,the results achieved are usually satisfactory.
出处
《天津城市建设学院学报》
CAS
1996年第4期39-44,共6页
Journal of Tianjin Institute of Urban Construction