西江大桥施工监控过程中 ,在长悬臂施工状态下 ,采用相对标高法立模 。
During the construction monitoring on a long span bridge over Xijiang River, formwork erected with relative elevation method under the condition of long cantilever construction are adopted which can remove temperature's effect on closed elevation to the full and effects gained in the practical engineering application are introduced in this paper.
出处
《公路》
北大核心
2004年第8期274-275,共2页
Highway