龙滩水电站水轮机模型及验收试验 被引量:5

Turbine model and model acceptance test for Longtan Hydropower Station
在线阅读 下载PDF
导出
摘要 为了检验龙滩水电站水轮机模型的水力性能,进行了水轮机模型验收试验。其内容包括效率试验、飞逸试验、空化试验、压力脉动试验、轴向水推力试验、蜗壳差压试验、成像观测试验及模型水轮机通流部件几何形状及尺寸检查测量等。验收结果表明:龙滩模型水轮机性能及其换算到原型的水力性能满足合同保证要求,模型的几何型线和流道尺寸可以用于真机的设计,采购及制造。 In order to demonstrate the hydraulic performance of model turbine applied at Longtan Hydropower Project, and made the model test. The model tests include efficiency tests, runaway tests, cavitation tests, pressure fluctuation tests, hydraulic axial thrust tests, Winter-Kennedy differential pressure tests, imaging observation tests and dimensional checks. The test results showed that the prototype of the model tests meets the guarantee above the contract, and the geometry of hydraulic contours of the model can be used for prototype design, procurement and manufacturing.
出处 《水力发电》 北大核心 2004年第6期56-58,共3页 Water Power
关键词 水轮机模型 模型试验 初步试验 验收试验 龙滩水电站 turbine model model test preliminary test acceptance test Longtan Hydropower Station
  • 相关文献

同被引文献18

引证文献5

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部