202m跨径钢管混凝土系杆拱桥的施工控制 被引量:9

The Supervisory of 202 m-span Concrete Filled Steel Tubular Tied Arch Bridge
在线阅读 下载PDF
导出
摘要 丹东月亮岛大桥是宽跨比为 1 /2 2 .44的下承式钢管混凝土系杆拱桥 ,采用单片桁架式 X型拱肋 ,利用桥面板内张拉钢铰线作为桥梁的系杆 .通过对该桥施工控制中采用的计算方法及施工中关键问题的分析 ,为该桥提出了合理的施工方案 . Dandong Moon Island Bridge is a through concrete-filled steel tubular (CFST) X type tie arch bridge with ratio 1/22.44 of width of deck to span. The section of the arch ribs adopts monolithic truss type,and the tie bar adopts the deck of the bridge. By analyzing the analytic method and some key questions in the erection of the structure,the rational construction method is provided. It can give a reference to the construction supervisory of long-span concrete filled steel tubular narrow tied arch bridge.
出处 《武汉理工大学学报(交通科学与工程版)》 北大核心 2004年第4期522-525,共4页 Journal of Wuhan University of Technology(Transportation Science & Engineering)
关键词 钢管混凝土 系杆拱桥 窄桥 下承式 系杆 施工控制 concrete-filled steel tubular tied arch bridge narrow bridge through bridge construction supervisory
  • 相关文献

参考文献1

二级参考文献3

共引文献12

同被引文献34

引证文献9

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部