摘要
国道324线云浮市区过境公路罗沙高填土路段的过渡路面的改造,根据旧路面的实际技术条件,通过计算分析,恢复或满足原设计路面的使用要求,既保证工程经济又符合工程技术要求。
The rebuildment of the high-filled soil section in Luosha of National Line324, based on the practical technology condition of the old pavement, by calculation and analysis, resumes or satisfies the original design requirements, and thus assure to be economical and in the mean time to accord with technological requirements.
出处
《广东交通职业技术学院学报》
2004年第1期24-27,共4页
Journal of Guangdong Communication Polytechnic