摘要 高明大桥扩建工程位于广东省佛山市高明区西江河道,主桥13#~15#墩岩面完全裸露,无覆盖层,无法按传统的方法搭设钻桩平台和埋设钢护筒,通过技术探讨和方案优化,采用了人造岩-组合平台方案,实践证明:此方案可行、可靠、经济,值得在同类型桥梁施工中推广应用. The extension works of GaoMing Bridge is over the Xijiang River course, Foshan city, Guangdong.The mound rock of the pier NO.13 to NO.15 of the main bridge exposed without cover layer can not be added the platforms and steel pile casings of the bored piles in traditional way. After professional disccusions in technology and scheme optimization, A Man-made rock-combination terrace scheme is settled. And practice has proved that this scheme is feasible, reliable and economical, which is worth popularizing and applying in the same mould bridge construction .
作者 刘宇平
出处 《广东交通职业技术学院学报》 2004年第1期5-8,共4页 Journal of Guangdong Communication Polytechnic
关键词 高明大桥 广东省佛山市 无覆盖层 钻孔灌注桩 施工技术 桥墩 extension works of GaoMing Bridge no cover layer bored cast-in-situ pile construction
  • 相关文献

同被引文献6

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部