摘要
风烟系统中空气预热器漏风和吸风机运行效率对于大型锅炉的经济运行有着直接影响。本文介绍了一台1025t/h在这方面改造中的做法及取得的效益,对同类机组有一定的借鉴作用。
The economic operation of large boiler is directly affected by the leakage of air preheater and the working efficiency of suction fan. The modification of 1025t/h unit has been presented which could be used for reference in similar units.
出处
《电站辅机》
2004年第2期37-40,共4页
Power Station Auxiliary Equipment
关键词
空预器
吸风机
改造
经济性
air preheater
suctionfan
modification
economy