根据北京昌平地区温度观测资料,确定了十三陵抽水蓄能电站工程砼冬施参数,达到了既能满足拆模强度,又保证了砼的质量。
Based on the data of temperature observation in Changping area of Beijing, the parameter of Ming
Tombs pumped storage station underground engineering in winter construction was determined,the strength
for form removal was met and the quality of concrete was also ensured in the construction.