摘要
右江百色水利枢纽地下厂房布置在辉绿岩内 ,围岩类型为Ⅱ ,Ⅲ类 ,以Ⅲ类为主 ,针对工程的地质特点、结构特点和施工通道、施工机械的性能 ,采用“平面多工序 ,立面多层次”的平行开挖交叉作业 ,自上而下分
The underground powerhouse of Baise multipurpose dam project is accommodated in the diabase body which ranks rockmass of class II and class III, with class III as major. In view of the geological and structural characteristics, the existing construction channels as well as the capacity of construction equipment, seven construction layers are designed featuring parallel excavation and interlayer working.