Sinopec's First Finished Product Pipeline Put into Operation
-
1Large Oil Field in Bohai Bay Put into Production[J].China Oil & Gas,2001,8(4):24-25.
-
2Banshan Gas-Fired Turbine Generator Set Put into Operation[J].China Oil & Gas,2005,12(2):50-50.
-
3Panorama of PetroChina Oil and Gas Development in 1996~2000[J].China Oil & Gas,2001,8(4).
-
4Wang Jiangge, Liu Haijun and Diao Feng.Cezi Island Crude Pier Put into Operation Successfully[J].China Oil & Gas,2006,13(1):26-26.
-
5Onshore Terminal Decarbonization Upgrading Project of Dongfang 1-1 Gasfield completed and put into service recently[J].China Oil & Gas,2005,12(2):64-64.
-
6Wang Lili.CCPIT Promoted Chinese Enterprises to Realize the Internationalization in 2016[J].China's Foreign Trade,2017(1):26-27.
-
7Manmath,N.Panda,廉抗利(译).BP公司评价、开发北坡油藏[J].石油科技动态,2009(5):44-50.
-
8YanShixin ZengZhong.Progress and Challenges for Petroleum Geophysical Techniques in China[J].Applied Geophysics,2004,1(1):1-7.
-
9刘红研,沙峰,詹亚力,朱建华.用新型活化剂强化原油蒸馏过程的研究[J].化工学报,2001,52(4):368-371. 被引量:2
-
10Liu Shujie,Yang Xiangqian,Guo Hua,Zhou Chao.Upgrading, Transforming, and Standardizing of Offshore Oil Drilling Equipment in China[J].China Oil & Gas,2016,23(3):31-37.