3A. R. Thompson,R. M. Hoover. REDUCTION OF BOILER FEED PUMP NOISE IN AN 800MW COAL-FIRED GENERATING UNIT [C]. IEEE Transactions on Power Apparatus and Systems, Vol. PAS - 98, No. 4, July/ Aug 1979.
4P. M. NISKODE, R. M. HOOVER,NOISE CONTROL APPROACHES IN THE DESITGN OF THERMAL POWER PLANTS [ C ]. IEEE, Transactions on Power Apparatus and Systems, Vol. PAS - 96, no. 4, July/August, 1977.
5J. P. Buechler, E. P. Thompson. NOISE CONTROL TECHNIQUES FOR EXISTING POWER PLANTS [ C ]. UFX Transactions on Power Apparatus and Systems, Vol. PAS - 96, no. 3, May/June 1977.
6William W. Avril, Richard A. Popeck. POWER STATION NOISE SOURCES AND SPECTRA [C]. IEEE Transac- tions on Paver Apparatus and Systeus, Vol. PAS - 96, no. 3, May/June 1977.