共振破碎对水泥混凝土板的力学行为影响 被引量:8

Mechanic Behavior of Resonant Rubblization on Concrete Slab
在线阅读 下载PDF
导出
摘要 基于温克勒地基板模型,采用有限元数值方法,对水泥混凝土板的动力模型、固有频率、共振破碎锤击压力大小、力的传递途径和规律进行了分析讨论。结果表明:不同锤击速度下,破碎接触压力不同,产生的破碎效果不同;共振破碎施工时应选择的最佳锤击接触力为20~35 MPa,并不是锤击力越大越好;按照最佳锤击接触力施工的水泥混凝土板的破碎失效模式为"上部碎石化下部拉裂"的形式,其碎石化的深度距路表10 cm内。 The dynamic model,natural frequencies,the pressure of resonant broken hammer and its transmission ways and laws of the cement concrete slab was discussed and analyzed by the finite element numerical method,which was based on the Winkler foundation model.The results show that the different hammering speeds generate different contact pressure,which cause different crushed effect.The most reasonable hammered contact force adopted in resonant rubblization project should be in range of 20 to 35 MPa.According to the fact that the most reasonable hammer contact impact force given in the practical construction with the fail model of cement concrete slab is the form of 'upper rubblized and lower tensile cracked ',the depth rubblized is in the range of 10 cm.
作者 刘金福
出处 《重庆交通大学学报(自然科学版)》 CAS 北大核心 2013年第5期938-942,共5页 Journal of Chongqing Jiaotong University(Natural Science)
关键词 共振破碎 温克勒地基板模型 最佳锤击力 失效模式 resonant rubblization Winkler foundation model the most reasonable hammered contact force fail mode
  • 相关文献

参考文献6

  • 1Chen Dahao,Huang Qinlong,Ling Jianming. Shanghai's experience on utilizing the for jointed concrete pavement rehabilitation[J].Journal of Performance of Constructed Facilities,2008,(06):398-407.doi:10.1061/(ASCE)0887-3828(2008)22:6(398).
  • 2黄琴龙,陈达豪,凌建明,徐柱杰.共振碎石化在上海水泥混凝土路面改建中的成效[J].长沙理工大学学报(自然科学版),2008,5(2):103-106. 被引量:31
  • 3宴星凡.基于仿真和优化方法的共振破碎机振动系统反求研究[D]成都:西南交通大学,2008.
  • 4王勖成.有限单元法[M]北京:清华大学出版社,2003.
  • 5包世华.结构动力学[M]武汉:武汉理工大学出版社,2005.
  • 6樊统江."高频低振幅共振技术在"白改黑"路面工程中应用研究"试验段总结报告[R]福州:重庆福通路工程技术咨询有限公司,2012.

二级参考文献6

  • 1[1]Robert La Force P E.Performance of Colorado's first rubblization project on I 76 near sterling[R].Colorado:Department of Transportation Research Branch,2006.
  • 2[2]Thompson M R.Hot-mix asphalt overlay design con-cepts for rubblized portland cement concrete pave-ment[R].Washington,D C:Transportation Research Board,1999.
  • 3[3]Timm D H,Warren A M.Performance of rubblized pavement sections in Alabama[R].Alabama:Depart-ment of Transportation,2004.
  • 4[4]Stephen Scbesta,Tom Scullion.Field evaluations and guidelines for rubblization in Texas[R].Texas:Transportation Institute,2007.
  • 5[5]Asphalt Overlays for Highway and Street Rehabilita-tion.Manual Series 17[M].USA:Asphalt Institute,2000.
  • 6[6]JTG F40-2004,公路沥青路面设计规范[S].

共引文献30

同被引文献58

引证文献8

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部