摘要
结合胜利油田高压水井修井作业存在的实际问题,分析水井带压作业的必要性,并介绍水井带压作业的关键技术:井口加压密封控制技术和管柱堵塞技术。
Combined with the actual problems in Shengli oil field high-voltage well workover operation exist,and analyzes the necessity of well pressure operation,and introduces the key technology and water well with pressure homework:wellhead pressure seal control technology and pipe plugging technology.
出处
《内蒙古石油化工》
CAS
2013年第21期119-120,共2页
Inner Mongolia Petrochemical Industry
关键词
带压作业
加压密封
管柱堵塞
Pressure operation
Wellhead pressure seal
Pipe plugging