期刊文献+

Modeling and Scheduling Optimization for Bulk Ore Blending Process

原文传递
导出
摘要 A new scheduling model for the bulk ore blending process in iron-making industry is presented,by converting the process into an assembly flow shop scheduling problem with sequence-depended setup time and limited intermediate buffer,and it facilitates the scheduling optimization for this process.To find out the optimal solution of the scheduling problem,an improved genetic algorithm hybridized with problem knowledge-based heuristics is also proposed,which provides high-quality initial solutions and fast searching speed.The efficiency of the algorithm is verified by the computational experiments.
出处 《Journal of Iron and Steel Research International》 SCIE EI CAS CSCD 2012年第9期20-28,共9页
基金 Item Sponsored by National Key Technology Research and Development Program in 11th Five-Year Plan of China(2006AA04Z184) National Natural Science Foundation of China(60974023)

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部