摘要
通过对济南黄河三桥55#墩桩基施工,对超长钻孔灌注桩的施工重点工序提出一些控制要点,同时对一些新施工方法做出阐述。
Through the construction of the third bridge pier foundation 55# of Jinan Yellow River,control requirements for key process of construction of the super-long bored pile are put forward and some new methods of construction are illustrated.
关键词
大直径
灌注桩
重点工序
施工控制
large diameter
pile
key processes
construction control