简析深圳抽水蓄能电站二等施工控制网的建立概况、测量方法、平差计算方法、检核方法、精度情况等并探讨经验。
This article firstly introduces the general situation of grade-II construction control network's establishment for Shenzhen Pumped Storge Power Station.Then it presents the methods of surveying,adjustment,checking as well as the results of precision.Finally,it also discusses similar experience.
出处
《广东水利电力职业技术学院学报》
2007年第1期68-71,共4页
Journal of Guangdong Polytechnic of Water Resources and Electric Engineering
关键词
施工控制网
GPS测量
检核
精度
construction control network
GPS survey
checking
precision