摘要
介绍了应用钻孔植筋方法加固丹江口大坝溢流坝段闸墩的工艺试验及施工过程。
The technological test and construction process of post-reinforcing in drillings of the piers of Danjiangkou overfall dam are described.
出处
《湖北水力发电》
2008年第5期37-39,共3页
Hubei Water Power
关键词
丹江口溢流坝
闸墩
植筋加固
Danjiangkou overfall dam
pier
post-reinforcing