摘要
针对20世纪90年代出厂的组合电器集中供气系统的缺陷,分析了保定供电公司110 kV变电站组合电器集中供气系统存在的问题,并结合现场实际情况,提出了改造措施。
According to the limitation of assembled electrical equipment centralized gas supply system produced in 20th century 90 years,the problems of substation system of Baoding Electric Supply Company are expounded,and improving measures are enumerated combined with practice status.
出处
《河北电力技术》
2007年第4期31-32,共2页
Hebei Electric Power
关键词
组合电器
集中供气系统
改造
assembled electrical equipment
centralized gas supply system
reformation