客运专线简支箱梁施工整体吊装移动模架设计 被引量:2

The Design of Movable Steel Shuttering Frame with Integral Hoisting in the Simple Support Box Beam Construction of Passenger Dedicated Railway line
在线阅读 下载PDF
导出
摘要 研究目的:移动模架原位浇筑施工方法在客运专线简支预应力钢筋混凝土箱梁施工中得到了广泛的应用。但常规的施工方法制梁周期长、人工操作工序多、施工较难控制。如何克服或减少这些缺点是一个值得研究的课题。研究结果:通过理论分析和结构设计,将预制梁场钢筋整体绑扎、整体吊装和内模大块安拆的理念应用到移动模架施工中可以有效减少施工周期、提高移动模架施工的工厂化、标准化水平、减少人为失误,进而提高移动模架原位浇筑施工方法的整体水平。 Research purposes:The method of in-situ concrete pouting of movable steel shuttering frame has been applied widely in the construction of prestressed concrete box girder beam of dedicated passenger rail-lines.But this construction method has more disadvantage,such as needing more manufacture cycles,more manual operation procedures and being more difficult to control the construction quality.How to overcome these shortcomings is a topic worthy of further studies. Research results:By theory analysis and struc...
出处 《铁道工程学报》 EI 北大核心 2007年第S1期302-305,共4页 Journal of Railway Engineering Society
关键词 客运专线 箱梁 整体吊装 移动模架 设计 passenger dedicated railway line box girder integral hoisting movable steel shuttering frame design
  • 相关文献

参考文献2

二级参考文献12

共引文献80

同被引文献2

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部